WE BUILD WHAT WE DRAW. — MEY İnşaat
CONSTRUCTION PROCESS
From foundation to roof
The timeline of a real construction site. As you scroll, the building rises in the order it was built.
Excavation
Ground is broken; the foundation pit and reinforcement are prepared.
Structural Shell
The foundation is poured; the reinforced-concrete frame rises floor by floor.
Walls
Brick infill walls are laid; the floor plans take shape.
Roof
The top floor is completed; the building reaches its highest point.

Animation off: the completed structure and the construction stages are listed below.
01 — ISTANBUL · RESIDENTIAL
WE BUILD
WHAT WE DRAW.
MEY İnşaat develops modern residential projects in Istanbul, backed by MEY Group's 23-year track record. We deliver the quality we promise, at the time we promise.

02 — PROJECTS
Our work
Each of our projects is a promise delivered.
03 — SERVICES
What we do
From land assessment to turnkey delivery: we run residential projects end to end, under one roof.
01
Assessment and design
Land analysis, geotechnical survey, and project design. The drawing is the commitment itself.
02
Permits and preparation
Approvals, site setup, and the work schedule. The timeline is clear from the start.
03
Construction
Controlled progress from excavation to roof; inspection and records at every stage.
04
Delivery
Turnkey handover at the promised quality, at the promised time.
04 — NUMBERS
MEY in numbers
- 23
- Years of group experience
- 6
- Years in construction
- Information pending
- Projects completed
- Information pending
- Units delivered
05 — CONTACT
Let's talk about your project
Reach us directly by phone, WhatsApp, or email.
Phone
Information pending
Information pending
Information pending


